Solar Subsidy & Net Metering Support in Telangana & Andhra Pradesh
The paperwork is where most rooftop solar projects stall. We file it, track it, and follow it through to the bidirectional meter on your wall.
Eagle Solar Systems handles the full subsidy and net metering process for rooftop solar customers in Telangana and Andhra Pradesh: PM Surya Ghar national portal registration, DISCOM application with TGSPDCL (formerly TSSPDCL), TGNPDCL, APEPDCL, APSPDCL or APCPDCL, technical feasibility follow-up, inspection coordination, bidirectional meter installation and the final subsidy disbursement claim. Residential systems are eligible for central subsidy under PM Surya Ghar; commercial and industrial systems are not, but do qualify for accelerated depreciation.

Everything we handle for you
Complete assistance with MNRE subsidies and TGSPDCL/APEPDCL net metering applications and documentation.
What the service covers
Eligibility check
We confirm whether your connection category, sanctioned load and roof ownership actually qualify before you spend anything.
PM Surya Ghar registration
National portal registration, consumer detail submission and vendor linkage completed on your behalf.
DISCOM application
Net metering application to TGSPDCL, TGNPDCL, APEPDCL, APSPDCL or APCPDCL with the correct annexures and drawings.
Technical feasibility follow-up
We chase the feasibility approval instead of leaving you to call the section office.
Inspection coordination
Site readiness, documentation and coordination with the DISCOM inspector on the day.
Meter & subsidy claim
Bidirectional meter installation coordination, commissioning report and the final subsidy disbursement claim.
Our six-step process
- 01
Eligibility & documents
Connection category, sanctioned load, ownership proof and bill history verified.
- 02
Portal registration
PM Surya Ghar consumer registration and vendor linkage.
- 03
DISCOM application
Net metering application filed with drawings and annexures.
- 04
Feasibility approval
Technical feasibility followed up until sanction is issued.
- 05
Installation & inspection
System installed, then DISCOM inspection scheduled and attended.
- 06
Meter & disbursement
Bidirectional meter installed, commissioning filed, subsidy claim tracked.
Sizing & options at a glance
| DISCOM | Region covered | Applies to |
|---|---|---|
| TGSPDCL (formerly TSSPDCL) | Hyderabad, Rangareddy, Medchal, Nalgonda, Khammam, Mahbubnagar | Telangana south |
| TGNPDCL | Warangal, Karimnagar, Nizamabad, Siddipet, Adilabad | Telangana north |
| APEPDCL | Visakhapatnam, Rajahmundry, Kakinada, north coastal AP | Andhra Pradesh east |
| APCPDCL | Vijayawada, Guntur, Krishna and Guntur districts | Andhra Pradesh central |
| APSPDCL | Tirupati, Nellore, Kurnool, Rayalaseema | Andhra Pradesh south |
Subsidy amounts, eligibility rules and DISCOM procedures are set by MNRE and the state utilities and change from time to time. We confirm the current position at the time of your application rather than quoting last year's numbers.
Subsidy & Net Metering across Hyderabad, Telangana & AP
Click your area for local details, DISCOM information and nearby projects.
Request a quote for Subsidy & Net Metering
Share a few details and our team will call you back with a written estimate, expected generation and payback.
- Free site survey across Hyderabad, Telangana & AP
- Written, itemised quote with no obligation
- Subsidy and net metering handled by us
Subsidy & Net Metering — common questions
Who is eligible for rooftop solar subsidy?
Central subsidy under the PM Surya Ghar scheme is for residential consumers with their own rooftop and a domestic electricity connection in their name, installing through a registered vendor. Housing societies and residential welfare associations have a separate provision for common-area systems. Commercial, industrial and institutional consumers are not eligible for this residential subsidy, though they can claim accelerated depreciation on the asset.
How does net metering work in Telangana?
Your rooftop system feeds the building first; surplus flows to the grid through a bidirectional meter and is credited in units against what you draw at night. Billing is settled on net consumption, so a well-sized system can cut your bill to the fixed charges alone. The application goes to TGSPDCL or TGNPDCL depending on your district, and requires technical feasibility approval before installation.
How long does the approval process take?
Timelines vary by section office and season, but a residential net metering application generally moves through feasibility, installation, inspection and meter installation over several weeks. The single biggest cause of delay is incomplete documentation at first submission, which is precisely what our filing service is designed to prevent.
Do you charge extra for handling the paperwork?
No. Subsidy registration and net metering filing are included with every rooftop system we install. We handle it because a system that is not net-metered does not deliver the savings we promised, and chasing a section office is not a reasonable thing to hand a customer after taking their money.